The main purpose of a belt conveyor is to transport goods from one location to another. In the middle of the delivery, it prevents the heat shrinkable machine and the packaging machine from completing a series of operations. So how much do you know about the installation method of belt conveyor? Next, I will give you a brief introduction.
First, before installing the belt conveyor, it is necessary to install 4 sets of deflector and steering roller before and after installing the belt frame, and then install the driving equipment.
(1) First of all, we should choose 10 mm screw, first install the single-sided drive plate and install the drive roller.
(2) Install the transmission plate on the other side.
(3) the second is to install the two end face bearings of the driving roller, the driving roller bearing seat and the sprocket.
(4) Then install the motor base (8mm×15 screws are generally used here)
(5) When installing the belt conveyor, tighten the screws to ensure that the transmission roller can rotate freely
(6) Install the motor chain and the belt conveyor motor chain
(7) Second, tighten the bolt of the motor base and install the chain at the same time.
(8) when installing the pull rod between the legs and the legs, the height of the legs should be adjusted to ensure the plane height of the conveyor to meet the requirements of the customer, and then the 1.5mm plate is sealed.
(9) After finishing the above work, we need to turn on the power to test the machine and adjust the belt to prevent deviation.
When assembling bearings, we should add grease.
The above is a brief introduction of the installation method of the belt conveyor that NAR gives you . I hope the above content can be helpful to you.